A paint workshop has to move cans continuously from the mixing area to the filling area. Carrying cans by hand means many trips per shift, and tilting a can even slightly spills paint onto the floor. The cans are slippery, and paint-covered hands raise the risk of dropping them.
FullSharp installed a pneumatic crane running on a ceiling-mounted rail, fitted with a hook tool for 4 paint cans at once. A force-sensing handle reads the operator's push, so the group of cans follows the hand, stays balanced, and lowers exactly into place.
A 4-paint-can hook tool hanging under the pneumatic crane on the ceiling rail in the mixing area.
Lifting all four cans at once sharply cuts the distance workers walk per shift.
The cans stay upright and move smoothly, limiting spills and keeping the floor cleaner.
No repeated heavy carrying, reducing shoulder and neck pain by the end of the shift.
FullSharp measures the full can weight, handle type, and distance between work stations. From there we design a hook tool that fits the handles exactly and lay out an efficient rail route. Call FullSharp to schedule a survey at your workshop.