Not every plant can hang a rail from its ceiling. A lightweight metal roof, a leased building, or a structure with unclear load capacity all make drilling overhead risky, not to mention that the building owner may simply not allow it.
For such cases, FullSharp built a freestanding steel frame carrying a 500kg-rated rail to mount a hoist. The entire load transfers down through the frame's legs rather than up into the ceiling. Installation is quick, and when production needs to be reorganized, the whole unit can be moved to a new location.
Freestanding steel frame carrying a 500kg rail with a hoist, installed at a workstation.
The entire load goes down through the frame's legs, so this solution works even with a metal roof or a weak ceiling.
A modular structure that can be assembled in a short time and dismantled when the layout is reorganized.
A 500kg capacity covers most parts and assemblies at a medium-sized workstation.
FullSharp measures the available floor area, clear ceiling height, and the load to be lifted to size the frame. Our engineers check the floor to decide whether anchor bolts are needed or a simple footing will do. We then fabricate, erect, test-run, and provide on-site warranty.