Several stages on the line need to lift loads up to half a tonne, but the floor is already packed with machines and forklifts can't fit in between. Every load move forces the line to stop just to clear a path.
FullSharp installs a ceiling-mounted rail running the length of the production line, carrying a 500 kg electric hoist. Loads are lifted and pulled along the rail from one stage to the next, so the floor never has to make room for equipment.
Ceiling-mounted rail with a 500 kg electric hoist running along the production line.
The whole system sits overhead, leaving aisles and machine positions untouched.
Loads travel along the rail from one station to the next without waiting for a forklift.
500 kg capacity covers most parts and molds found on the shop floor.
FullSharp checks the roof structure and span before finalizing the rail's cross-section and number of mounting points for a 500 kg load. We install the system, load-test it to standard, then hand it over with documentation and a maintenance schedule.