The customer needed a lifting system for daily, high-frequency operation, built to European standards for consistency. Mixing a rail from one source with a hoist from another often means mismatched tolerances, causing the trolley to run jerkily and wheels to wear out fast. Maintenance also becomes difficult when components don't belong to the same system.
FullSharp supplied an ABUS rail paired with an ABUS electric hoist, with the rail and trolley built to the same tolerance system for smooth travel from one end of the beam to the other. The hoist includes a brake and safety mechanisms to the manufacturer's standard. Replacement parts stay consistent and readily available going forward.
An ABUS rail system with an ABUS electric hoist installed in a factory, with the trolley running along the beam.
Rail, trolley, and hoist share the same system, matching tolerances for smooth running and fewer minor faults.
The structure and hoist are rated for continuous duty cycles, suited to multi-shift factories.
Replacement parts come from the manufacturer's catalog, with no need for improvised repairs.
FullSharp measures the actual lifting load, span, and lift height to select the right rail size and ABUS hoist model. Our engineers also check the hanging structure and available power supply at the installation site before finalizing the plan. Contact FullSharp to schedule a site survey.