FullSharp installed a ceiling-mounted 500 kg rail with a drum gripper that clamps the rim of full 200-liter drums and moves them along the filling line. The grip tightens as the load gets heavier, and the operator pushes gently to travel and lower each drum, so the clean area stays free of forklifts and the floor stays clear of columns.
A full 200-liter drum is heavy and unstable to roll by hand, especially when it must be stood upright or placed onto a platform. A forklift with drum-clamping forks is bulky, and clean areas do not want forklifts driving in. The floor around the filling area also leaves no room for support columns.
FullSharp installs a ceiling-mounted 500 kg rail with a dedicated drum gripper tool. The tool clamps onto the drum's rim, gripping tighter under heavier loads, so the operator simply pushes gently to move the drum along the line and lower it into position.
Drum gripper tool hanging from a 500 kg rail system mounted to the ceiling of the storage area.
The clean area keeps its floor and air quality intact, with no forklift driving in.
The clamp grips the drum's rim and tightens further under load, so the drum never slips mid-transfer.
The whole system stays overhead, so the aisle and filling area below remain unobstructed.
A drum gripper hung from an overhead rail clamps the drum rim and lifts it, and a trolley carries it along the rail with a light push. This keeps forklifts out of clean areas where floor traffic and exhaust are not wanted.
The clamp arms are designed to grip tighter as the load increases, so a heavier drum is held more firmly. Rail end stops also keep the trolley from running off either end of the track.
A ceiling rail leaves the floor around the filling area free, since no support columns are needed. FullSharp sizes the hanger rods to the actual load and checks the roof structure before installation.
FullSharp measures the drum's diameter and rim profile, its weight when full, and the warehouse's clear ceiling height. We then select the right gripper tool for your drum type and plan the rail route to match your workflow. Call FullSharp to schedule a site survey.