Many factories want lifting equipment but their floor is already packed with machines and cart lanes. A standing crane column takes up space and requires foundation work that stops production. And when the load is only a few hundred kilograms, a double-girder crane is overkill.
FullSharp chose to hang the whole system from the ceiling: the rail is fixed to the roof structure, and a 200 kg pneumatic crane runs along it. The floor stays exactly as it was — the operator simply pulls the handle and the load follows along the entire length of the rail.
A 200 kg pneumatic crane on a rail fixed to the factory's roof structure.
No columns, no foundation, so cart lanes and machine layout stay exactly as before.
Mostly just hanging the rail from the roof, with minimal construction so the plant barely has to stop.
Compressed air carries the heavy part, and workers only guide direction, so a full shift is less tiring.
FullSharp inspects the roof structure, the truss spacing, and the clear height before finalizing the mounting plan. We calculate the load at each hanging point, then propose a rail route that fits your existing traffic lanes. Contact FullSharp to schedule a survey.