Many stages need a load set down with real precision, not just lifted and lowered. Pushing buttons step by step is slow and hard to judge, while doing it by hand is heavy and any misplaced load has to be lifted again.
FullSharp installs a ceiling-mounted aluminum rail with a 200 kg pneumatic jib fitted with a force-sensing handle. The operator holds the handle, and however much they push or pull, the load follows by that same amount, almost like an extension of the arm.
200 kg pneumatic jib with a force-sensing handle, hanging from the aluminum rail.
The load follows hand force, so operators judge position by feel instead of lifting it back up.
Step-by-step button presses are eliminated, keeping pace with the line's speed.
New workers pick it up after a few tries, with no lengthy training required.
FullSharp measures the travel route, ceiling height and heaviest load to finalize the aluminum rail and jib crane size. We install the system, tune the handle's sensitivity to your workers' habits, then hand it over.