A plant needs a lifting line running along the production flow, but the roof can only bear a light load. The goods also have handles and lifting lugs, so tying cables each time takes too long. Workers lifting by hand nonstop through a shift get tired, and the pace keeps slowing down.
FullSharp installs an overhead aluminum rail and suspends a pneumatic jib crane along with a dedicated hook tool. The aluminum rail is light, so the load on the roof is small, and the trolley runs smoothly along the line. The hook tool fits the goods' lifting points exactly, hook on and lift, eliminating the tying step.
Overhead aluminum rail suspending a pneumatic jib crane with a hook tool for material handling in the plant.
Aluminum rail is lighter than steel beams, so the existing roof structure usually needs no reinforcement.
The hook tool fits the lifting points exactly, so each lift takes only seconds.
Pneumatic power gives smooth speed, with no jerking when lifting starts or when lowering.
FullSharp measures the lifting load, ceiling height and purlin type to select the aluminum profile and hanger rod spacing. Our engineers examine the product's lifting points to build a matching hook tool. Contact FullSharp for a site survey and proposal.