FullSharp hung a 5T rail rated for 200 kg from the ceiling with threaded rods and fitted an ENDO pneumatic hoist on the trolley, for lifting jobs spread along a long line where a crane column would block the aisle. The hoist is controlled by a lever and stops at any height without the load drifting, while the trolley runs the full length.
Lifting work is spread along a long line rather than concentrated at one point, so installing a crane column in the middle of the plant would use up floor space and block the aisle. The floor is already packed with machines, leaving no room for a base.
FullSharp hangs a 5T rail rated for 200 kg from the ceiling structure using threaded rods, with the trolley running smoothly along the entire line. On the trolley sits an ENDO pneumatic hoist, raised and lowered with a lever and able to stop at any height without the load drifting.
Ceiling-mounted 5T rail and ENDO pneumatic hoist installed in the plant's production area.
The entire load hangs from the ceiling, leaving the plant floor clear for machines and carts.
The trolley carries the hoist to any point on the rail, with no need to carry loads by hand along the middle section.
The pneumatic hoist slows gradually, so the load doesn't jerk when it stops.
A ceiling-mounted rail with a hoist on a trolley. It covers the whole line from above, so there is no column in the aisle, and the rail can be joined in sections to extend it.
Yes. The ENDO pneumatic hoist in this project is controlled by a lever and holds the load at the chosen height without drifting, which helps when fitting parts or changing molds.
The rail hangs on threaded rod sets bolted to purlins or ceiling beams, and each rod can be adjusted in height. FullSharp sets the rail level during installation so the trolley runs smoothly.
FullSharp checks the ceiling structure to see whether the purlins can bear the suspended load or if extra support beams are needed, then measures the required line length. From there we finalize the number of rail sections, the spacing of suspension points, and the hoist hook height. Contact FullSharp to have a technician measure the plant on site.