Many plants want another lifting point but have no room to build a new column, and a new foundation would mean stopping production. Meanwhile, the lifting task at that station continues every shift, wearing out workers and slowing the line.
FullSharp uses an aluminum rail jib crane bolted straight onto an existing column, suspending an ENDO air balancer for the 80 to 500 kg range. The lightweight aluminum rail lets the trolley roll smoothly, the arm rotates a full 360 degrees around the column, and the service area is wide without using any extra floor space.
An aluminum rail jib crane mounted on a plant column, suspending an ENDO air balancer at the work station.
Mounting on an existing structure means no foundation work and no long production stoppage.
The aluminum rail and trolley roll smoothly, letting the operator move the load with a light push.
The 80 to 500 kg range covers both light assembly items and heavier sub-assemblies.
FullSharp checks the column cross-section, its load-bearing capacity, and the desired working radius before designing the mounting bracket. Our engineers select the aluminum rail length and air balancer model to match the actual load, then install and test on site.