FullSharp installs a 5T overhead rail with a 200 kg rated load along a machine line, with a KITO electric hoist on a trolley for parts lifted on and off machine tables many times per shift. The pendant controls the hoist, the brake holds the load steady, and a light push moves it along the rail with no crane on the floor.
A machining station needs to lift parts on and off the machine table many times per shift, each load modest but repeated constantly. Lifting by hand tires workers and makes it hard to place parts precisely. A floor-mounted crane would block the walkway around the machine.
FullSharp installs a 5T overhead rail (200 kg rated load) hung from the roof truss along the machine line. A trolley on the rail carries a KITO electric hoist, lifting and lowering with a push-button pendant and holding the load steady when released. The operator only needs a light push to move the load along the rail.
5T overhead rail with KITO electric hoist installed along the machine line in the shop.
The electric hoist handles the lifting, so the operator only aims the drop point.
With no floor-mounted post, carts and workers move freely around the machine.
Every lift is the same, so parts do not knock against the machine table.
The 5T steel rail here has a 200 kg rated load and is cut to length to match the machine line. FullSharp sizes the rail to the real parts.
A floor-mounted crane would block the walkway around the machines. The overhead rail hangs from the roof truss and leaves the floor free.
The trolley moves with a light push for precise positioning, and the KITO hoist holds the load steady when the pendant button is released.
FullSharp measures the truss span, ceiling height, and machine line to determine the hanging points. Our technicians select the hoist based on actual load and lift frequency, then install the rail, run a load test, and explain the periodic inspection routine.