A machining station needs to lift parts on and off the machine table many times per shift, each load modest but repeated constantly. Lifting by hand tires workers and makes it hard to place parts precisely. A floor-mounted crane would block the walkway around the machine.
FullSharp installs a 5T overhead rail (200 kg rated load) hung from the roof truss along the machine line. A trolley on the rail carries a KITO electric hoist, lifting and lowering with a push-button pendant and holding the load steady when released. The operator only needs a light push to move the load along the rail.
5T overhead rail with KITO electric hoist installed along the machine line in the shop.
The electric hoist handles the lifting, so the operator only aims the drop point.
With no floor-mounted post, carts and workers move freely around the machine.
Every lift is the same, so parts do not knock against the machine table.
FullSharp measures the truss span, ceiling height, and machine line to determine the hanging points. Our technicians select the hoist based on actual load and lift frequency, then install the rail, run a load test, and explain the periodic inspection routine.