Production areas located on upper floors are often narrow, with no room for a forklift. Loads weighing several hundred kilograms have to be carried by hand through narrow aisles, which is both slow and dangerous for both people and product.
FullSharp installed an overhead rail with a suspension rod and bracket system fixed to the concrete ceiling, supporting a KITO 200 kg hoist. The trolley carries the hoist along the rail, so loads are lifted and moved right overhead while the floor below stays clear for work.
Overhead rail with a KITO 200kg hoist installed at a production area on an upper floor.
The suspension structure is calculated to the actual ceiling, so it can be safely installed even on the 4th floor.
With no support columns, the area below still has room for workbenches and aisles.
The KITO hoist runs smoothly and stops firmly, staying consistent through many repeated cycles a day.
FullSharp checks the floor and ceiling structure of the installation floor to calculate safe suspension points. After the survey, we finalize the rail length, the number of suspension rods, and the placement of the travel end stops.