Loads weighing several hundred kilograms are awkward for forklifts, which get blocked by machines and have to queue in narrow aisles. Manual hoisting is slow and hard to position accurately in the middle of a production line.
FullSharp installed a 500 kg overhead rail running the length of the production line. A trolley slides along the rail, carrying the load straight from one end of the line to the other, while the floor stays clear for people and carts.
500 kg overhead rail line with hanger brackets and trolley installed in the plant.
The whole system sits overhead, so the floor has no columns or track to obstruct carts.
The load runs along a set rail, so the route repeats accurately with fewer collisions with machines on either side.
The rail joins in sections, so extending the line or adding a branch later doesn't mean starting from scratch.
FullSharp visits the plant to measure truss spacing and check the roof's load-bearing capacity before confirming mounting points for a 500 kg load. Our engineers map the rail route to follow the load's actual path, so no section needs manual carrying. Tell us your building length and the load to be lifted, and we'll schedule a site survey.