Loads weighing a few hundred kilograms need to travel back and forth between two fixed points in the plant. A cart gets in the way of the aisle, while a double-girder crane is overkill for the actual need.
FullSharp installed a 500 kg overhead rail along that exact path. A trolley pulls the clamping tool along the rail, so the load always travels overhead and the aisle below stays clear.
A 500 kg overhead rail line in the plant, with a trolley and clamping tool below.
Loads travel overhead, so the floor isn't taken up by a cart.
Cheaper and faster than building a double-girder crane for the same need.
A set rail route keeps repeated moves consistent, with fewer mistakes.
FullSharp checks whether your ceiling structure and purlins can bear the hanging load, then lays out the rail route to match your production flow. We build the clamping tool to your actual parts and install the complete line.