FullSharp set up a pneumatic jib crane on a fixed column between stations of a bicycle assembly line, with a pneumatic hoist and hanging set that keeps each frame suspended. The operator swings the arm to the next station without scuffing the paint, and because the system runs on compressed air it produces no sparks next to the paint area.
Bicycle frames are bulky, and carrying them by hand risks scuffing the paint layer, with each station transfer usually needing two people. Since the line runs on a fixed rhythm, even a few seconds' delay at one station backs up everything behind it.
FullSharp erects a pneumatic jib crane on a fixed column right between the stations. A pneumatic hoist keeps the frame suspended, and the operator rotates the arm to swing it to the next station. The system runs on compressed air, so it sparks no flame and can be used right next to the paint area.
Pneumatic jib crane lifting a bicycle frame at one station on the assembly line.
Moves the frame between stations quickly and evenly, without waiting for enough workers.
The frame hangs suspended, never resting on a table or bumping into structures while moving.
The system runs on compressed air, so there's no electrical spark at the working end.
A pneumatic hoist runs on compressed air, so there is no electrical spark at the working end. That makes it suitable for use right beside painting and drying areas where electric motors are a concern.
The frame hangs from hooks and slings that hold it in the correct orientation, so it never rests on a table or bumps into structures while moving. One operator replaces the two people who used to carry it.
Yes. The lever-controlled hoist stops exactly at fixture height and the arm swings straight to the next station, so transfers are quick and even and the line does not wait for extra workers.
FullSharp weighs the frame, measures the distance between stations and the fixture height to select the right reach and hoist stroke. Our technicians check the column's foundation and the compressed air supply before installation. Contact FullSharp to schedule a line survey.