For an industrial pipe workshop, FullSharp installed a column-mounted jib crane built on its 5T steel rail, rated 200 kg, with a 250 kg electric hoist on a trolley. The arm swings around the column so one operator lifts pipe sections from the rack to the machine table by pendant button, in a space too tight for a forklift.
Industrial pipe workshops need to move pipe sections onto the machine table many times per shift. Two workers carrying them by hand is slow and risks denting the pipe surface. The space around the machine is also tight, so a forklift cannot get in.
FullSharp installs a 5T rail jib crane mounted on a support column, with a Black Bear 250 kg electric hoist hanging below. The 5T rail is FullSharp's steel section code, rated for 200 kg, enough to lift one pipe section at a time. The arm swings around the column so the operator can move pipes from the rack to the machine right from their standing position.
A 5T rail jib crane mounted on a support column, carrying a Black Bear 250 kg electric hoist at the pipe processing area.
One person presses a button to lift and swing the pipe section, no need to call in extra workers to carry it.
The rotating column stays in one spot, leaving the aisle and work area around the machine clear for other tasks.
The hoist runs smoothly, lowering the pipe onto the machine table gradually with minimal impact that could scratch the surface.
5T is FullSharp's code for a steel rail section, not a 5 tonne rating. In this project the rail is rated for 200 kg and forms the trolley track of the jib arm, which is enough to lift one pipe section at a time.
The space around the machine was too tight for a forklift. A jib crane fixed to a column swings over the work area from one spot, keeps the aisle clear, and lets one person lift and place pipes without calling extra workers.
The electric hoist runs at a steady speed and lowers the pipe gradually onto the machine table, which limits impact. FullSharp can also fit a suitable sling or clamp for the pipe surface and diameter on site.
FullSharp visits your workshop to measure the intended column or post for mounting the crane, the ceiling height, and the arm radius needed. Our engineers verify the actual load weight to select the correct rail size, hoist, and column anchoring method. After the survey, you receive a layout drawing and a specific installation schedule.