At a machining station, parts and trays must move back and forth between the machine table and the storage rack all shift. Manual lifting tires workers and risks drops when reaching far. Installing a large overhead crane would be overkill for the actual weight of the goods.
FullSharp installs a 5T rail right along the work line, rated at 200 kg, suited to light and medium loads. A KITO electric hoist runs on the rail, controlled by a pushbutton pendant. The worker presses to lift, pushes the trolley along the rail, and lowers into position without needing a helper.
A 5T rail with a KITO electric hoist installed along the machining station's work line.
The light rail system suits loads under 200 kg, no need to invest in an oversized crane.
One hand on the pendant for lifting, the other guiding direction, no extra helper required.
The KITO hoist runs reliably, with simple replacement and routine inspection.
FullSharp measures the rail line, ceiling height, and load-bearing structure to finalize the right mounting method. Our engineers also weigh the goods to be lifted and review the operating frequency before selecting the hoist's speed and lift height. After the survey, you'll receive a layout drawing and installation schedule.